Schedule Visualization
0h
4h
8h
12h
16h
20h
24h
Machine 1
Machine 2
Machine 3
Total Makespan
24.5h
-15% improved
Machine Utilization
87%
+12% improved
Jobs Completed
42
On schedule
Average Wait Time
1.2h
-30% reduced
Setup Changes
8
-5 reduced
Est. Cost Savings
$3,450
Per day
Optimization Results
The optimized schedule shows significant improvements in machine utilization and overall makespan. Critical path jobs have been prioritized to minimize bottlenecks.
- ✓ Reduced idle time by 45%
- ✓ Improved on-time delivery to 98%
- ✓ Minimized setup changes between jobs
- ✓ Balanced workload across all machines